FORMER CENTRAL GOVERNMENT OFFICE WEST WING, HONG KONG

Case Study

Client: ARCHITECTURAL SERVICES DEPARTMENT, HONG KONG SAR GOVERMENT
Architect: RONALD LU PARTNERS
Main Contractor: TECHOY CONSTRUCTION COMPANY LTD.
Specialist Contractor: Stonewest (HK)
Services Provided: Cleaning, Restoration & Renovation, Conservation

Project Overview

The three buildings in the Central Government Offices (CGO) Complex were built post-war in three phases with the West Wing completed in 1959 and awarded Grade 1 status by the Antiquities Advisory Board in 2012.

Renovation works for the West Wing were undertaken to allow for the re-use of the building by the Department of Justice and law-related organizations.

Stonewest (HK) were appointed to carry out the restoration of the mosaic tiles, the key character defining element of the external façade.

Key Successes

  • Thermatech steam cleaning of the external façade to expose the original mosaic panels.
  • Joint inspections with the architect and engineer to develop elevation repair schedules.
  • Salvaging mosaic tiles for re-use.
  • Low pressure injection grouting & mechanical fixing of the existing panels to the existing concrete substrate.
  • Sampling and manufacture of new mosaic tiles to match existing.
  • Spalling repairing to concrete substrate.
  • Patch repair of mosaic tiles where required.

Related Projects

Cowdray & Midhurst Heritage

THE PENINSULA HOTEL, YANGON, MYANMAR (Facade Strengthening Package)

Regents Crescent (Ice House)

“JESSVILLE”128 POK FU LAM ROAD, HONG KONG

London Bridge Station

UNIVERSITY OF CHICAGO CENTRE, HONG KONG (Conservation Package)

THE VICTORIA & ALBERT MUSEUM (Heritage)

THE PENINSULA HOTEL, YANGON, MYANMAR (Conservation Package)

Interested in working with us?

Tell us more about your project requirements
image1
image2