Description
Supply and installation of new Kentish rag stone and bath stone copings. Lime mortar pointing. Clearing drainage goods.
The works involved:
- Ensuring existing scaffold was adapted so it was suitable for our masonry works.
- Carefully dismantling eroded masonry whilst preserving as much
as possible. - Value engineering the work to ensure the client budget was
not overspent. - Re-build roof turret and parapet wall back to original line
and level. - Lime mortar repair works carried out through extreme weather. Careful protection and monitoring required.