Description
Stonewest were appointed for the supply, installation and design layout of lime stone flooring.
The works involved:
- The lime stone flooring was installed in the Atrium, conference room, and external entrance.
- 300 x 300 x 10mm thick limestone was laid in the bathroom with 750 x 100 x 15 mm thick skirting.
- All areas were sealed with Lithofin MN sealer.
- All tiles were produced to size hence requiring minimal site cutting.
- Ti-lock ND-TOG movement joints were installed at 9m centres.
- Stainless steels trims formed the finishing to carpet intersection and drain intersection.
Other Work in Commercial sector